Northeast Sector Sewer Master Plan
The Northeast Sector Sewer Master Plan update reflects the City's current planning with respect to the anticipated sanitary sewer needs for northeastern Vacaville, identifying remaining actions needed to meet those needs.
Final Draft (December 1, 2009) of Master Plan:
Summary, Sections 1 & 2 (PDF - 4.3 MB)
Executive Summary
Section 1: Introduction
Section 2: Policies and Methodology
Sections 3-5 (PDF - 6.7 MB)
Section 3: Horse Creek Lift Station Plan Area
Section 4: Upper NESAD Plan Area
Section 5: Lower NESAD Plan Area
Appendicies (PDF - 1.8 MB)
Appendix A: Point Load Capacity Allocation
Appendix B: Cost Estimates
Appendix C: Assessor's Parcel Maps
Appendix D: Genentech Flow and Peaking Factor Summary
Appendix E: Calculation for NESAD Cost Share for Areas A and W
Appendix F: Funding Flow Chart for NESAD Sewer Projects
The final draft report will be considered for adoption at the City Council meeting on December 8, 2009 at City Hall at 7:00 pm in the Council Chambers. Questions may be sent to:
Deb Galway Senior Civil Engineer Utilities Department
(707) 469-6418 PO Box 220 Elmira, CA 95625 dgalway@ci.vacaville.ca.us
|